Setting The Order of Running The Policies


The status of the policies added to the message traffic zones can be changed, whichever is before or after. The operations required to change the order in which the operation is performed are performed in the Operation Sequence section of the policy management window of the relevant region.

The policy list in this section shows the order in which it is operated. To change this order, click the buttons showing the up and down next to the relevant policy.

Figure: Policy operation order